CeilAir DX Series Manual do Operador Página 16

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 60
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 15
(Mar, 2012)
CeilAiR OHS Series Installation, Operation & Maintenance Manual
A
ir Technology Systems, Inc.
2-5
CAUTION
The probes must not touch the mounting sur-
face. Failure to adhere to this may result in
improper operation of equipment.
2.4.5.4 Cable Type Water Detector
Lay the cable water detector across the surface
where water could
collect. When water is
present, current will
ow between the two
wires.
2.5 Air Distribution Connection
2.5.1 Spot Cooler (See Figure 2)
For units that are not ducted, the air conditioner should
be mounted above the ceiling grid, leaving suf cient
space for the air grilles to rest on the ceiling T-bar.
NOTE
Placement of the grilles is important. The
hinged lter grille goes on the return air side
of the unit. The 3-way directional grille goes
on the conditioned air discharge side of the air
conditioner. Gasketing is factory supplied for
an air seal between the bottom ange of the air
conditioner and the grille. After mounting the air
conditioner, lower the air conditioner until the
gasket meets the grille.
Figure 2- Spot Cooler Grille
Vista de página 15
1 2 ... 11 12 13 14 15 16 17 18 19 20 21 ... 59 60

Comentários a estes Manuais

Sem comentários